Doumen Water Purification Plant

· Commercial Building
Section image

The water source consists of 52 groundwater wells, covering an area of 85 mu. Our company has completed the weak - current projects and pipeline construction of the monitoring system, access control system, etc. in the automatic control part of the general plan, system, office building decoration and other projects of the water purification plant. It has overcome the problem of wireless network switching of scattered well eyes, saved a large amount of wiring and solved the problem of system instability, ensuring the stable and reliable monitoring and transmission of the water source wells.